国产精品综合色在线观看_91网站在线视频_99人精品一二区_午夜香吻视频在线看免费_蜜桃一区二区三区

×

News

Conch Chuangye Wuwei Haichuang Domestic Waste-to-energy Project Successfully Realizes the First Car of Waste into the Plant
Date:2021-12-07 From:海螺創(chuàng)業(yè)

        With the correct leadership of the company and the strong support of various departments, with the cooperation and cooperation of the construction unit, the supervision unit, the participating units and the brothers, all the staff of Conch Venture will work together, December 5, 2021 10 At 18 hours, the Wuwei Municipal Solid Waste Incineration Power Generation Project realized the smooth entry of the first vehicle of solid waste into the plant. Wuwei Urban Management Bureau, Shijian Town Government, all staff of Conch Venture Wuwei Haichuang and relevant persons in charge of the participating units of the Wuwei Project witnessed this moment.

825aefb77dd1bc08762ce7b18994d46.jpg

The first garbage truck entered the factory smoothly 

        At 10:18 in the morning, the domestic garbage truck of Wuwei City was accompanied by a rumbling of firecrackers, dressed in red silk and red flowers, under the command of the Wuwei Haichuang site staff, passing the logistics gate, floor scales, and trestle slowly. Drive into the unloading hall. With the call of "Conch Venture Wuwei Haichuang's First Garbage Start Unloading", the household garbage was smoothly discharged into the garbage pit.

1b04ffa253032227961f55530d3ca0b.jpg

Group photo 

        The Conch Chuangye Wuwei Haichuang project is equipped with 2×500 tons/day mechanical grate furnace domestic waste incinerators. The project is planned at one time and implemented in two phases. The first phase of the project has a processing scale of 500 tons/day, and it can process domestic waste after reaching production capacity18 10,000 tons/year.

3d29ccb92d37edcdd7eebc8db6ec8fe.jpg

Conch Chuangye Wuwei Haichuang Domestic Waste Incineration Power Generation Project (Aerial View) 

        Conch Chuangye Wuwei Haichuang’s first truck of garbage entered the plant smoothly, marking the end of the construction of the Wuwei municipal solid waste incineration power generation project, which is about to enter the trial production stage, and the project will enter the "countdown" for grid-connected power generation. Conch Entrepreneurship and Wuwei Haichuang all staff will continue their efforts and sprint with all their strength, starting from the ceremony of the first truck of garbage entering the factory, supervising the completion of the project, making solid preparations before trial production, and launching a sprint to the grid-connected power generation target within the year. Make more contributions to the harmless treatment of domestic garbage and the improvement of the living environment in Wuwei City!

巫山县| 昌邑市| 海晏县| 宁海县| 朝阳区| 依兰县| 潢川县| 康马县| 呼图壁县| 永年县| 凤翔县| 安化县| 汾西县| 兴义市| 靖安县| 大同县| 蕲春县| 哈密市| 锡林郭勒盟| 偃师市| 六盘水市| 万全县| 云林县| 新竹市| 拜城县| 墨玉县| 怀集县| 广宁县| 赤峰市| 青海省| 射洪县| 登封市| 甘德县| 通江县| 宜阳县| 恩施市| 怀化市| 乐山市| 凤庆县| 平昌县| 资兴市|